Kitchen Renovation Cost in Dubai 2026 — The Complete Price Guide


Kitchen renovations are consistently the highest-ROI home improvement project in Dubai — and consistently the one where homeowners get the most unpleasant surprises about cost. Quotes ranging from AED 15,000 to AED 150,000 for what appears to be the same kitchen are not unusual, and understanding what drives that gap is essential before you commit to anything.
This guide gives you the real numbers for kitchen renovations in Dubai in 2026, broken down by scope, specification level, and property type. No vague ranges — actual figures you can use to sense-check a quote.
Kitchen Renovation Cost in Dubai at a Glance (2026)
| Renovation Scope | Apartment Kitchen | Villa Kitchen | What's Included |
|---|---|---|---|
| Cosmetic refresh | AED 5,000–12,000 | AED 8,000–20,000 | New cabinet doors, handles, worktop, paint, new sink and tap |
| Mid-range full renovation | AED 15,000–35,000 | AED 25,000–60,000 | New carcasses, doors, worktop, splashback, appliances, flooring |
| Premium full renovation | AED 35,000–70,000 | AED 60,000–150,000+ | Custom cabinets, stone worktops, premium appliances, full fit-out |
| Like-for-like appliance replacement | AED 3,000–8,000 | AED 5,000–15,000 | New oven, hob, dishwasher, fridge installed |
Prices include supply and installation. Structural changes, moving walls, or relocating plumbing and electrical significantly add to cost — see below.
Cost by Kitchen Component
Understanding what each element costs independently helps you prioritise and compare quotes properly.
| Component | Budget Range | Mid Range | Premium Range |
|---|---|---|---|
| Base and wall cabinets (supply + install) | AED 8,000–15,000 | AED 15,000–30,000 | AED 30,000–70,000+ |
| Worktop — laminate | AED 1,500–3,000 | — | — |
| Worktop — engineered quartz | — | AED 3,500–8,000 | — |
| Worktop — natural marble or granite | — | — | AED 6,000–18,000+ |
| Splashback — tiles | AED 800–2,000 | AED 2,000–4,000 | — |
| Splashback — glass or stone | — | — | AED 4,000–10,000 |
| Sink and tap | AED 800–1,500 | AED 1,500–3,500 | AED 3,500–10,000+ |
| Built-in oven | AED 1,500–3,000 | AED 3,000–6,000 | AED 6,000–15,000+ |
| Hob (induction or gas) | AED 800–1,800 | AED 1,800–4,000 | AED 4,000–12,000+ |
| Extractor hood | AED 600–1,500 | AED 1,500–3,500 | AED 3,500–8,000+ |
| Dishwasher (integrated) | AED 1,500–2,500 | AED 2,500–4,500 | AED 4,500–9,000+ |
| Kitchen flooring (per sqm installed) | AED 60–90 | AED 90–150 | AED 150–300+ |
| Lighting (recessed + under cabinet) | AED 800–1,500 | AED 1,500–3,000 | AED 3,000–8,000+ |
What Makes Dubai Kitchen Renovations More Expensive Than You Expect
Several factors push costs higher in Dubai specifically — and most contractors don't volunteer this information upfront.
| Factor | Typical Additional Cost | Why It Applies in Dubai |
|---|---|---|
| Moving plumbing (sink relocation) | AED 2,000–5,000 | Concrete floors require breaking out and reinstating |
| Upgrading electrical circuit | AED 1,500–3,500 | Older apartments often have inadequate amperage for modern appliances |
| Removing existing tiles | AED 1,500–3,500 | Most Dubai kitchens have floor-to-ceiling tiles requiring full removal |
| Waterproofing under new flooring | AED 800–1,500 | Essential in Dubai apartments to protect floor below |
| Gas line modification | AED 1,000–3,000 | Requires licensed gas engineer, mandatory in Dubai |
| NOC from developer or OA | AED 500–2,000 | Required for structural or layout changes in most Dubai communities |
| Waste disposal (skip hire) | AED 500–1,500 | Often excluded from quotes but always necessary |
How Long Does a Kitchen Renovation Take in Dubai?
| Renovation Type | Typical Duration | Notes |
|---|---|---|
| Cosmetic refresh (doors, worktop, tap) | 3–5 days | No structural work, minimal disruption |
| Full mid-range renovation | 2–4 weeks | Cabinet manufacture lead time is the main variable |
| Premium custom kitchen | 4–8 weeks | Custom cabinet manufacture takes 3–5 weeks alone |
| Full renovation with layout change | 4–8 weeks | Structural, plumbing, and electrical work adds time |
The most common cause of delays in Dubai kitchen renovations is cabinet manufacturing lead time. Most kitchens are custom-made to measure and take 2–5 weeks from order confirmation to delivery. Confirm this timeline before starting any demolition — being without a kitchen for 6 weeks because cabinets are delayed is one of the most common renovation complaints in Dubai.
Kitchen Renovation ROI in Dubai
A kitchen renovation delivers the highest return on investment of any room in a Dubai villa or apartment — but the relationship between cost and return is not linear.
| Investment Level | Typical ROI at Resale | Rental Premium |
|---|---|---|
| Cosmetic refresh (AED 5,000–12,000) | 150–200% | 5–10% rental uplift |
| Mid-range full renovation (AED 15,000–35,000) | 100–150% | 10–20% rental uplift |
| Premium renovation (AED 60,000+) | 60–90% | 15–25% rental uplift in right communities |
The cosmetic refresh delivers the best pure financial return — replacing cabinet doors, handles, worktop, and tap for AED 8,000–12,000 can add AED 15,000–25,000 to a property's value and is the single best value renovation you can do before selling or re-letting.
What to Check Before Signing a Kitchen Renovation Quote in Dubai
The majority of Dubai kitchen renovation disputes come from unclear or incomplete quotes. Before signing anything, confirm in writing:
- Cabinet specification — what brand, what board thickness (18mm minimum for carcasses), what door material and finish, what hinges and drawer runners (Blum or equivalent — not generic)
- Worktop specification — exact material, thickness, edge profile, and whether cutting and installation is included
- What's excluded — appliances, flooring, tiling, electrical upgrades, plumbing changes — these are commonly excluded from headline quotes
- Payment schedule — never pay more than 30-40% upfront. Milestone-based payments tied to completion stages protect you if work stalls
- Lead time for cabinets — confirm the manufacturing and delivery schedule before demolition begins
- Waste disposal — who removes the old kitchen and how
- Defects liability — what's the warranty period and what does it cover
The Red Flags in a Dubai Kitchen Quote
After years of working with Dubai homeowners, these are the warning signs that a kitchen quote is going to cause problems:
- A quote given without a site visit or detailed measurement
- No breakdown of costs — just a single lump sum
- Full payment requested upfront
- No mention of cabinet brand or board specification
- A price significantly lower than all other quotes (the cabinets will be poor quality)
- No written contract — just a WhatsApp agreement
- No mention of how long the project will take
Finding a Reliable Kitchen Renovation Specialist in Dubai
BidMyJob.ae connects Dubai homeowners with kitchen renovation specialists across the UAE. Post your kitchen project free — describe your kitchen size, your current layout, and what you want to achieve — and receive competitive quotes from experienced contractors. You can read reviews, compare detailed quotes, and ask questions before committing to anything.
Got Questions?
Frequently Asked Questions About Kitchen Renovation Cost in Dubai 2026
The price gap is driven by your specific scope, such as whether you are doing a cosmetic refresh or a structural fit-out, and the tier of materials chosen. Hidden costs like relocating plumbing in concrete floors or upgrading electrical circuits to meet modern appliance demands also frequently impact the final quote.
Still have questions? Get free quotes from verified pros.
Post your job on BidMyJob.ae and receive competitive bids within hours.
Need a professional for this? Get quotes on BidMyJob → and get free quotes from UAE specialists.
