How do I find a good flooring contractor in Dubai?
I need to replace the flooring throughout my Dubai villa. I have had very variable quotes ranging from AED 18,000 to AED 55,000 for what seems like the same job. How do I find a reliable flooring contractor and make sure I am comparing quotes correctly?
1 Answer
5 Jul 2026
Why Flooring Quotes Vary So Much in Dubai
The large variation in flooring quotes in Dubai is almost always explained by differences in what is included, the quality of materials being quoted, and the level of experience of the contractor. A low quote may exclude subfloor preparation, adhesive, transition strips, skirting board replacement, or waste removal. Material specification is the biggest variable: tiles at AED 40 per square metre versus AED 200 per square metre can look identical in a quote that just says ceramic tiles.
How to Compare Flooring Quotes Properly
Ask every contractor to provide an itemised quote specifying the material brand and product code, material price per square metre, labour rate per square metre, subfloor preparation costs, adhesive and grout specification, and what is excluded. Compare quotes line by line rather than total only. Request to see samples of the actual materials being quoted rather than catalogue photos.
What to Check Before Hiring
Ask to see completed projects in Dubai, ideally in properties similar to yours. Request references from previous clients and contact them. Confirm the contractor has a valid trade licence. Check whether they use in-house installers or subcontract, as quality control differs. A detailed written contract specifying materials, timelines, and payment schedule protects both parties.
Getting Flooring Quotes on BidMyJob
Post your flooring job on BidMyJob.ae and get quotes from flooring professionals. Browse their profiles and previous work before deciding who you want to hear from.
— BidMyJob Advice Team | support@bidmyjob.ae
Frequently Asked Questions
What questions should I ask a flooring contractor in Dubai?+
Ask for the specific tile or floor product brand and code they will use, whether subfloor preparation is included, how they handle uneven floors, what their warranty covers, and how long the project will take. Also ask whether they remove and dispose of existing flooring, as this is sometimes excluded from quotes.
What are red flags when getting flooring quotes in Dubai?+
Red flags include very low quotes with no itemisation, requests for more than 30 percent deposit upfront, no written contract, inability to show completed projects, and vague descriptions of materials. Significantly cheaper quotes almost always reflect lower material quality or missing scope items that will surface as extras during the job.
How long does villa flooring replacement take in Dubai?+
A 4-bedroom villa flooring replacement covering 200 to 300 square metres typically takes 2 to 4 weeks including subfloor preparation, tiling, grouting, and curing time. Factors that add time include complex tile patterns, large format tiles requiring more precision, and extensive subfloor levelling requirements.